Review and save the completion-pack details used for external wrap closeout.
Reference guide for the fields, signatures, and generated documents in this modal.
This form collects the information needed to generate your customer's Completion Pack — a set of official documents required to close out an external wall insulation project. The pack contains 3 documents:
Once saved, you can email the homeowner a secure signing link or print the pack to collect a signature in person. The homeowner reviews the full PDF before signing — a single signature covers both documents that require one. The homeowner should retain a copy of the ESBN Safety Notice in case their home is selected for an SEAI inspection.
Informs the homeowner that ESB Networks temporarily relocated the electricity supply cables to allow external wall insulation to be installed. ESB will return within several weeks to re-fix the cables permanently. If ESB has not returned within 4 weeks the homeowner should call 1800 372 757 quoting their MPRN and ESBN ID.
SEAI requires this notice when mechanical extract ventilation in wet rooms (kitchen, bathroom, utility) has not been installed before wall insulation. It confirms the installer discussed MEV options with the homeowner in accordance with Chapter 10 of NSAI SR 54. Both parties must sign. Retain for any future SEAI inspection.
A 10-year product warranty issued by P.W. FAST covering all materials in the insulation system (adhesives, base coats, primers, plasters and paints). The distributor signs on behalf of FAST. The homeowner keeps this card as proof of warranty — they do not sign it. Note: after 24 months the homeowner may request an on-site warranty review (cost: 200 PLN, credited back if defects are found).
Track the forms and documents still needed to close out this project.
Track the key client-side grant and payment records on file for this project.
Mark materials and delivery milestones as they arrive on site.
Choose the named team responsible for this external wrap project.
Category and address
Use this workspace to manage the live job: check the current phase, clear blockers, and open the project record only when something changes.
Preparing phase guidance.
| Move | Client | Project | Flow | Team | Order | Status | Progress | Schedule | Workspace | Deliveries | Paperwork | SEAI Pack | Actions |
|---|